Home / Patios & Paving
Service · York & North Yorkshire
Patios & Paving in York
Porcelain, Indian sandstone and natural stone, laid on a full mortar bed with the falls set to take water away from the house. Where levels change, we build the steps and retaining walls to suit rather than working around them.
How we lay it
Full bed, not five blobs
Plenty of patios are still laid on five dabs of mortar, one in each corner and one in the middle. It is quicker, it uses less material, and it is the reason so many slabs rock, crack across the middle or ring hollow when you tap them.
Every slab we lay goes down on a full mortar bed with a primer slurry on the back of the slab, so there is complete contact and nowhere for water to sit and freeze. Porcelain in particular has to be primed, because nothing sticks to the back of it otherwise.
Falls are set at roughly one in eighty running away from the building, and the finished level is kept at least 150mm below the damp proof course. Where that is not possible, a channel drain goes in along the wall instead.
What we work with
- Porcelain. Dimensionally accurate, frost proof and low maintenance, with a consistent colour and a slip rating suited to outdoors. Best for a crisp, modern finish.
- Indian sandstone. Warm, riven and naturally varied. Forgiving on older properties and the usual choice where the patio has to sit against weathered brick or stone.
- Limestone and granite. Denser and more uniform than sandstone, holding a darker tone when wet.
- Steps and level changes. Built in brick or block, then clad with matching treads so the whole thing reads as one piece of work.
- Raised beds and seating walls. Matched to the existing brickwork where there is any, with coping stones on top.
- Inset lighting and channel drains. Ducted in before the paving goes down, so no cables are chased in afterwards.
Start to finish
How a patio goes in
Levels and setting out
We work out the finished level first, working back from the door threshold and the damp course, then set the fall and mark the shape out on the ground.
Dig out and sub-base
Excavated to depth, membrane down, then MOT type 1 compacted in layers. A patio still needs a base even though it never sees a car.
Ducting and drainage
Any lighting ducts, channel drains or soakaway connections go in while the ground is still open.
Walls and steps
Retaining walls, step cores and raised beds are built and left to go off before any paving is laid on or against them.
Lay on full bed
Slabs primed and bedded on a full mortar bed, levelled off a string line, with joints kept consistent throughout.
Point and clean off
Jointed with a brush-in compound or hand pointed, then washed down and the surrounding brickwork cleaned of any splashes.
Recent patios
Around York
Common questions
Patio questions
How much does a patio cost in York?
Porcelain or Indian sandstone, which is better?
Do I need a sub-base under a patio?
Can you match a new patio into an existing one?
How long before I can use it?
Is laying a patio a DIY job?
How do I choose the right patio contractor?
What to expect
Before any of that starts
A free site visit and a written, itemised quote come before any work is booked in, so materials, labour and any level changes are agreed up front. Access for barrows and deliveries is discussed at the visit, and the site is left clean at the end of each day. Weather can move a start date, but not the standard the job is built to.
Why DH Hardscapes
Why Choose DH Hardscapes for Your Patio
Full Mortar Bed, Every Slab
No five-dab shortcuts, where mortar only sits in the corners and the middle. Every slab goes down on a full, primed bed with complete contact underneath, so nothing rocks, cracks or rings hollow underfoot years later.
Matched Into What's Already There
A genuine skill in blending new paving against older, weathered surfaces, since an exact colour match off the shelf is rare. The join is broken deliberately with a step, border or change of course, so it reads as intentional rather than patched.
Levels Set to Protect the House
Falls and finished heights are calculated against the damp proof course before a single slab goes down, not adjusted afterwards once a problem shows up. Where the levels do not allow enough clearance, a channel drain goes in instead.
Planning a new patio?
Free site visit, written quote, no obligation.